ANZ George Street

 
Client:ANZ
Date:Nov-Dec 2010
Location:Dunedin

This job was required for exterior refurbishing purposes by a third party. We used the new speedy frame Layher system. The job took about 1 day to erect.

A road safety plan was in place through the DCC.